- Position raft foundation
former
- Dig Foundation trenches
- Place underlay and
reinforcing according to Engineer design and cast dense concrete
- Power float slab
- Erect
moladi
plastic shutter formwork
- Place plumbing and
electrical pipes-window and door frames - reinforcing - roof truss blockouts
- 4 hours.
- Fill
moladi
formwork with mortar (concrete without stone), either
by bucket or pump - 2 hours
- Remove the
moladi
formwork the
following day.
- Fix Ceiling, roof,
electrical wiring, paint glaze, etc.
- Complete
|
|
|
One of
the important principles under a lean production paradigm is termed
‘lean assembly’. This refers to simplifying the process of assembly
through industrialisation, modularisations, standardisation, and
continuous flow processes. The reduction of operations
required for a production process means less chance of the
occurrence of errors, waste and rework. This follows from the same
logic that the fewer the number of operations, the higher the
quality of the product and a predictive timeline, resulting in cost
savings.
moladi
plastic
concrete formwork system
technology provides and assists with the full range of requirements involved in
the transfer and use of a proven low construction cost housing
technology. We supply technology and support
transfer of know-how to empower
individuals to achieve worth, by meaningful action to raise those at
the “bottom of the pyramid” to a higher level, supplying low cost
housing technology. Low construction cost - not poor quality.
-
human settlements | low cost
housing | tokyo sexwale, human settlements, low cost housing,
low-cost-housing, moladi plastic shutter formwork, Housing for poor people,
South Africa, human
settlements | low cost housing | Tokyo Sexwale, Tokyo Sexwale, Human Settlements
- Sustainable human settlements and communities
|
|